Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 36 results ...

Aoieong, R T (2004) Capturing quality costs of construction processes using the construction process cost model (CPCM), Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Au, C Y M (2013) An optimal contract strategy in managing extension of time provisions in building contracts, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Bao, Q (2003) Effective energy management during a building's life cycle, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, K C G (2012) The use of virtual reality for visualizing construction safety management process, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, T S A (2005) The impact of subordinates' professionalism on leadership effectiveness in the construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, Y M T (2008) The role of finance in competitiveness of indigenous contractors in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chen, Z (2003) An integrated analytical approach to environmental management in construction, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Dai, F (2010) Applied photogrammetry for 3D modeling, quantity surveying, and augmented reality in construction, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Fiona, T S C (2009) A critical study on performance-based fire safety design in Hong Kong with timber perforated ceilings as an example, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Guo, H (2009) Rethinking construction project management using the VP-based manufacturing management model, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Hao, J L J (2002) Better use of information: A simulation model for international construction joint ventures in China, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Hong, J (2006) A study on analytic approaches to intelligent buildings assessment, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Huang, T (2009) Virtual prototyping technologies enhanced construction planning, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

  • Type: Thesis
  • Keywords: accuracy; efficiency; project team; construction project; building information model; building information modeling; collaboration; constructability; construction method; construction planning; manufacturing; project delivery; scheduling; virtual prototyp
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/305157455
  • Abstract:
    With the development of building information modeling (BIM) tools over the last 20 years in the construction industry, greater use has been made of multi-dimensional models throughout the entire construction cycle. Whilst most BIM applications have focused on either four-dimensional (4D) or five-dimensional (5D) technology, the Construction Virtual Prototyping Laboratory in The Hong Kong Polytechnic University incorporates all possible dimensional technologies in an integrative computer-based platform known as Construction Virtual Prototyping (CVP). This platform, which supports the design and construction of buildings in a virtual environment, was customized from the DELMIA solution produced by Dassault Systemes for simulating manufacturing processes. The aim of this study was to develop an integrated framework and process for applying CVP to help project teams to improve the constructability of the design, the feasibility of construction methods, and the accuracy of construction scheduling. The primary research methodology adopted in this study was action research, which is an iterative inquiry process that consists of planning before the action, applying the action, and reviewing after the action. This study undertook the following three-cycle iterative process: (1) development of an integrated framework for applying CVP, (2) application of the framework to a real construction project using model simulation, and (3) reviewing the framework based on responses from a number of project participants. The definitive framework that evolved from the iterative process is the study's main contribution to the body of knowledge. It provides a hand-on guide to incorporate the VP technologies into existing construction project delivery processes. It enables contractors to experiment with various construction methods in a virtual environment before deciding on the best method for a particular project. The study found that the integrated framework based on CVP technology improves collaboration efficiency between main contractor and sub-contractors by approximately 30 percent, with a concomitant 30 to 50 percent reduction in meeting time. It was also found that the most important benefits of CVP in the construction planning stage are improved accuracy of process planning and shortened planning time, whilst during the construction implementation stage the benefits are facilitation of fieldwork instruction and reduction of rework.

Jaillon, L C (2009) The evolution of the use of prefabrication techniques in Hong Kong construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Lam, W M (2005) A conceptual model of success for design and build projects in the public sector of Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Lee, L P (2012) Do construction workers accept automated monitoring? A study on the acceptance level and its antecedents, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Leung, W Y (2006) A study of the competitiveness of local contractors in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Liang, Y (2006) Integrated IT systems for construction site management, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Lin, G (2009) Measuring the performance of value management studies in construction, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Liu, G W (2003) A framework for implementing value management in China's construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Lu, W (2006) A system for assessing and communicating contractors' competitiveness, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Luo, X (2011) A knowledge-based electronic meeting system for implementing value management in construction briefing, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Ochoa Paniagua, J J (2011) Production planning approach for implementing sustainable building projects, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Oo, B L (2007) Modelling individual contractors' bidding decisions in different competitive environments, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Pan, Y H (2007) Application of industrialized housing system in major cities in China: A case study of Chongqing, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Tan, Y (2009) Contractor's competitiveness and competitive strategy in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Tang, L (2011) Effective and efficient briefing in public private partnership projects in the construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Tse, T-c (2009) The interoperability of building information models and document models in the Hong Kong construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Wong, K W J (2007) Development of selection evaluation and system intelligence analytic models for the intelligent building control systems, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Wong, W H (2007) Developing and implementing an empirical system for scoring buildability of designs in the Hong Kong construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Xia, B (2010) The selection of design-build operational variations in the people's republic of China using Delphi method and fuzzy set theory, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yang, C (2004) Knowledge-based understanding and interpretation of construction engineering drawings, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yang, J (2010) A framework for stakeholder management in construction projects, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yao, H (2009) A dynamic approach for evaluating the sustainability performance of infrastructure projects, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yip, R C P (2009) The cultural shift of the construction industry of Hong Kong under the influence of sustainable development, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).